NOTQIN KM System — Master Index

What this is. A complete inventory of every category of document a Moroccan industrial-B2B startup needs in its knowledge management system. For each: what it’s for, what you have today, what’s missing, when to touch it.

What this is NOT. A general-vault knowledge map — that’s Knowledge Base Map. This index is venture-specific — NOTQIN artefacts only.

For deeper detail on each ❌ critical artefact (what it is, why it matters, what blocks what, what propagates), see NOTQIN Critical Artefacts — Dependencies & Tracker.

How to read this. Status icons: ✅ exists & current · ⚠️ exists but stale or partial · ⏳ planned but missing · ❌ critical gap · — not applicable yet.


0. Map of the vault (where things live)

DigiTMPE/                              ← the Obsidian vault root
├── 00_Home/                           ← daily-touch surface, dashboards, this index
├── 01_Project Portfolio/NOTQIN Ecosystem/   ← per-module product status
├── 02_Knowledge Base/                 ← evergreen domain knowledge (Industry 4.0, AI…)
├── 03_Research Intelligence/          ← market & competitor & people intel
├── 04_Strategy/                       ← strategy, OS docs, feasibility, GTM
├── 05_Team and Collaboration/         ← pitch decks/HTMLs, letters, PRDs, charters
├── 06_AI Workflows/                   ← how-Claude-helps-deliver playbooks
├── 07_Learning/                       ← founder learning roadmap, courses tracked
├── 09_Ventures/notqin-gmao/           ← GMAO product venture (added since May; Engine+Distribution delivered)
├── portal/                            ← synced public/docs site build (not yet indexed here)
└── (memory/)                          ← Claude auto-memory, outside the vault

Since last audit (2026-05-21 → 2026-07-26): three cross-cutting decisions this index did not yet reflect — D-002 rebrand Smartex→NOTQIN (done, ADR-020), D-006 NOTQIN goes industrial-first with textile/TEMASA as the beachhead (health verticals parked; Auto Tier-2/CBAM sequenced behind textile, not parallel), and a 04_Strategy/Decision Log.md now exists and is the canonical record of these forks. See NOTQIN Decision Log.


1. Strategy & Direction (open every Monday)

The “where are we going” layer. Everything else cascades from these.

DocStatusFileWhat’s missing / next action
Team Onboarding & Alignment Pack✅NOTQIN Team Onboarding & Alignment Pack 2026One-shot kick-off doc. Context floor + per-role required reading (Week 1, 8–12h) + 3-month deepening (Wave I–M) + structured 19-question feedback form. Alignment Meeting target 2026-06-07 → rewrite Path-to-Pilot with team input → Wave I starts 2026-06-09.
Path-to-Pilot — Team Orchestration⚠️NOTQIN Path-to-Pilot — Team Orchestration 20265-person team (Ahmed/Elwalid/Imrane/Oussama/Mouad) · 6 workstreams · rituals Mon/Wed/Fri. The “parallel-push Auto Tier-2 + CBAM” framing is superseded by D-006 (2026-06-13): NOTQIN is industrial-first with textile/TEMASA as the sole beachhead; auto/CBAM are sequenced behind it, not parallel. Doc needs a rewrite pass to match.
TEMASA Pilot 1 (beachhead)✅TEMASA — NOTQIN Pilot 1 (Dossier, Roadmap & Discovery)NEW since May, per D-006. Textile/hosiery beachhead: OEE/downtime + defect scorecard wedge, NOT CBAM. Ladder = paid Diagnostic (Q3) → paid Pilot (Q4).
Industrial intelligence operating thesis✅NOTQIN Industrial Intelligence Operating Thesis 2026Canonical — binds UNS standard + sector packs + customer anatomy + Tier-2 sprint + PFE backbone + founder curriculum into one decision-layer thesis. 5-layer model + 9-stage roadmap + 5 Moroccan wedges.
Master operating manual✅NOTQIN Project Management OS—
Sales / go-to-market manual✅NOTQIN Go-to-Market OS—
Sector addendum — aero & auto✅NOTQIN GTM — Aeronautics & Automotive—
18-month founder roadmap✅DigiTPME Founder Roadmap 2026-2027Refresh after sprint outcome
Current-quarter strategy⚠️Q3-2026-strategyRewrite OKR1 — still Hallotex-anchored; per D-006 (2026-06-13) it should re-baseline onto TEMASA, not just drop Hallotex
Master / Market / Product / Partnership / Funding / Learning strategies✅04_Strategy/Master Strategy.md + 6 siblingsMost ≈ 3KB, lightweight — usable
Morocco-specific industrial strategy✅NOTQIN Morocco Industrial Strategy—
Operating context✅DigiTPME Operating Context—
Exam-period operating overlay✅Exam Period Operating System 2026-05Refresh per semester
Strategic thesis (one-pager)✅Strategic ThesisVerify still current
Master decision log✅NOTQIN Decision LogShipped 2026-05-24, actively maintained — D-001 through D-012 as of 2026-07-17 (this row was stale — file existed since the prior audit but was never flipped)

2. Product (open weekly during build cycles)

What we sell, how it works, what’s shipped.

DocStatusFileWhat’s missing
Ecosystem map (overview)✅NOTQIN Ecosystem Map—
Modular integration architecture✅NOTQIN Ecosystem — Modular Integration Architecture—
Architecture playbook✅NOTQIN Architecture Playbook—
Per-module status✅NOTQIN Core · NOTQIN IEIA · NOTQIN Agent · NOTQIN Physics · NOTQIN Research · NOTQINVR · NOTQIN Grid · NOTQIN IEIA Plan 2026—
MVP scope + acceptance✅NOTQIN MVP Acceptance Criteria · NOTQIN MVP Agent Entrypoint · NOTQIN MVP Current App Inventory · NOTQIN MVP Evaluation Against Features · NOTQIN MVP Roadmap From Current State—
Product spec (long)✅DigiTPME MVP — Product Specification v1Aging — refresh annually
PRDs (Phase 1 platform)✅05_Team and Collaboration/PRD — *.md (12 PRDs: GI-1/2/3, IA-1/2/3, SIBD-1/2/3, IT/OT/Integration)—
Sector-pack catalog (master index)⏳TODO — 01_Project Portfolio/NOTQIN Ecosystem/Sector Packs Index.mdOne-page index of all 5 live packs + status
Public product roadmap⏳TODO — 01_Project Portfolio/NOTQIN Ecosystem/Public Roadmap.mdStrips internal detail; for sharing with prospects/partners
Release notes / changelog❌TODO — 01_Project Portfolio/NOTQIN Ecosystem/CHANGELOG.mdWave-by-wave shipping history, customer-facing
Security & compliance posture⚠️Scattered across Morocco UNS Standard v0.2 + PRD SIBD-2Consolidate into 04_Strategy/NOTQIN Security & Compliance Posture.md (CNDP + DGSSI + IEC 62443 + GDPR posture)
GMAO module✅09_Ventures/notqin-gmao/ (Engine + Distribution delivered; media capture ADR-044, reporting + inventory shipped 2026-07-25/26; UX audit 42/65 findings fixed on unpushed branch)New venture since May, not previously indexed. Deployed nowhere yet — deploy + G0-3 pilot is next; blocked on iframe/realm/CORS/tenancy vs factory-app (see project_gmao_factoryapp_integration)

3. Customers & Sales (open weekly during outreach)

The pipeline from cold lead to signed contract.

DocStatusFileWhat’s missing
ICP + 5-stage funnel✅NOTQIN Customer Engagement Playbook—
Pilot Trust Ladder + MUST-NOTs✅NOTQIN Pilot Playbook—
Auto Tier-2 narrow thesis✅Feasibility Study — NOTQIN Auto Tier-2 Scorecard 2026Fill §6 What we heard after the discovery sprint
Auto target list✅AMICA Tier-2 Target List 2026Fill rows 4–12 with real names from AMICA directory
Aero target list⏳TODO — 04_Strategy/GIMAS Aero Target List 2026.mdPhase-3 deliverable; build only after first Tier-A reference
Textile / cement / steel / agrifood target lists⏳TODO — one each, parked until Phase 2+—
Pricing menu✅NOTQIN Go-to-Market OS §6 + Aero/Auto addendum §6Validate via discovery sprint (H3)
SOW templates per Trust Ladder rung⚠️Rendered via trust-ladder-pilot-sow skillDrop a static SOW template into 04_Strategy/Templates/Pilot SOW R0-R4.md for offline reading
Discovery-call notes (per call)⏳TODO — 03_Research Intelligence/Discovery Calls/<company>-<date>.mdOne file per call during the sprint
Pipeline tracker⚠️Embedded as table in GTM OS §2AConsider standalone 04_Strategy/NOTQIN Pipeline.md once > 10 accounts in motion
Lost-deal post-mortems⏳TODO — 04_Strategy/Lost Deals/<company>.mdCreate on first loss
Reference customers (logos, quotes)—Not applicable yetBuild after first paying contract
Case studies—Not applicable yetFirst one ≈ 3 months after first paid pilot

4. Marketing (open weekly when in active campaign)

How prospects discover us; how we tell the story.

Doc / assetStatusFileWhat’s missing
Brand / design system direction✅NOTQIN — Design System Research & DirectionConvert to a concrete brand guidelines PDF (logo, colour tokens, type, voice)
Sales pitch — Industrial AI (long HTML)✅05_Team and Collaboration/NOTQIN — Pitch Industrial AI.html—
Sales pitch — Sourcing & Banc Industriel✅NOTQIN — Sourcing Prototype & Banc Industriel.{md,html}—
Sales pitch — Maintenance✅pitch-maintenance.html—
Sales pitch — Aero & Auto landing + lead form✅NOTQIN — Pitch Aero & Auto.htmlWire form to a real backend (Formspree / Worker) before going live
One-pager — AMICA scorecard defense✅NOTQIN — AMICA Scorecard Defense.html—
One-pager — GIMAS aero / Nadcap / FAI⏳TODOBuild after 3 discovery calls in aero (Phase 3)
One-pager — generic NOTQIN⏳TODO — sector-agnostic version for events—
Whitepaper — AOG / physics-signature counterfeit detection❌TODO — co-author with Ahmed Ratnani (UM6P)Highest-leverage credibility asset for Phase 3 aero play
Investor deck v1❌TODO — derive from Feasibility Study — DigiTPME 2026 + RoadmapGate-conditional on first paying contract
2-min demo video (screencast)❌TODO — factory-app + IEIA + CBAM Agent flowUnblocks every cold-email sequence
90-sec AS9100D audit-evidence demo⏳TODO — Phase 3—
90-sec IATF / PPAP demo⏳TODOCould be Phase 1 if sprint validates
Founder LinkedIn content calendar✅Founder LinkedIn CadenceShipped 2026-05-21 (this row was stale — file existed since Phase 0 but main table never flipped) — check cadence is still being kept up weekly
Public NOTQIN website (interim: ahmedbenahmed.com)⚠️Source drafted: NOTQIN.ma Site Skeleton · Deploy to ahmedbenahmed.com first; swap to notqin.ma once registeredFixed broken wikilink (was NOTQIN Public Site — Content Skeleton, no such file — actual file is NOTQIN.ma Site Skeleton). Owned credibility — the pitch HTMLs are sales tools, not the home base
Press kit (logo bundle + founder bio + photo + key facts)❌TODO — 05_Team and Collaboration/Press Kit/Needed for any La Vie Éco / Lematin / Hespress placement
Brand voice / messaging guide⚠️Embedded in GTM OS §3 message treePull into standalone 04_Strategy/NOTQIN Brand Voice.md
Event calendar❌TODO — 04_Strategy/NOTQIN Events Calendar 2026-2027.mdGIMAS / AMICA / Aerospace Meetings / CGEM / 212 Founders / Auto Expo
Press placement log⏳TODO — 04_Strategy/Press & Earned Media.mdEmpty until first placement
Pitch-preview folder✅05_Team and Collaboration/Letters/harrizi-pitch-preview/—

5. Research & Market Intelligence (open when scoping or before a meeting)

What we know about the market, competitors, regulations.

DocStatusFileWhat’s missing
Moroccan Industrial Maturity Dossier✅Memory: project_moroccan_industrial_maturity + linked vault files—
Morocco UNS Standard v0.1 + v0.2 + 6 overlays✅02_Knowledge Base/Industry 4.0/—
Aero MRO wrong-part-detection dossier✅Aero MRO — Wrong-Part Detection on Test Cell 2026—
OCP Research Intelligence✅Memory: project_ocp_research + linked files—
4.0 Solutions intelligence✅Memory: project_40solutions—
4Sight Holdings competitive intel✅4Sight Holdings — Competitive Intelligence 2026—
ThreadCloud + Knowledge Graphs✅Memory: project_threadcloud_knowledge_graphs—
MaestroHub / IIoT Platform Build intel✅IIoT Platform Build Intelligence — Open Source Stack 2026—
Morocco Digital Transformation Communities✅Morocco Digital Transformation Communities—
UM6P CMSI seminar intel✅UM6P CMSI — AI National Security Seminar Intelligence 2026—
Regulatory tracker (CBAM, CNDP, DGSSI, IATF)✅Regulatory Tracker (03_Research Intelligence/Regulatory Tracker.md)Shipped 2026-05-21 (this row was stale). ⚠️ A second, newer, unlinked file also exists — 04_Strategy/Regulatory Tracker — 2026-Q2.md — reconcile into one before next audit
Competitor master index⏳TODO — 03_Research Intelligence/Competitor Index.mdStill missing. One-page roll-up of 4Sight + Capgemini + MaestroHub + ThreadCloud + local SIs + SAP/Siemens channels
Industry analyst quotes / market sizing⏳TODO — 03_Research Intelligence/Market Sizing References.mdStill missing. Cite-able numbers (Mordor, OBG, Policy Center) for decks
Vendor / partner profiles⚠️03_Research Intelligence/Industrial Vendors/ — 3 exist: Crouzet, ThreadCloud, Industrial Software Providers in Morocco (2026-07-11)Still missing: HiveMQ, EMQX, MaestroHub, Ignition

6. People & Network (open before any meeting or intro request)

Who we know, who we want to know, who matters.

DocStatusFileWhat’s missing
People Map✅People MapRewritten 2026-05-24 as proper Type-2 KMS Knowledge Directory (13 sections, status codes, maintenance discipline). Closes the long-flagged ⚠️ underuse gap. Front-door for 03_Research Intelligence/People & Network/. Refresh monthly + after meaningful contacts.
Stakeholder Register✅NOTQIN Project Management OS §2—
Personal Profile (founder)✅Personal Profile—
Career Strategy✅Career Strategy—
Named-contact intelligence — Dr Driss HARRIZI✅03_Research Intelligence/People & Network/Dr Driss HARRIZI.md—
Internal team dossiers — Elwalid · Imrane · Oussama · Mouad✅03_Research Intelligence/People & Network/{Elwalid,Imrane,Oussama,Mouad}.mdCreated 2026-05-24 — populated post-Alignment-Meeting with §5 feedback answers
Thought-leader dossiers — Walker Reynolds · Bob Vanderoulen · Travis Cox🟡03_Research Intelligence/People & Network/{Walker Reynolds,Bob Vanderoulen,Travis Cox}.mdStub + deep-research prompt 2026-05-24 — Ahmed runs prompt in Gemini / ChatGPT Deep Research, pastes results into the dossier sections
Folder index✅03_Research Intelligence/People & Network/README.mdConventions for adding new people
Named-contact intel — Ahmed Ratnani + Hamza Keurti✅UM6P CMSI intel file—
Named-contact intel — Walker Reynolds✅Memory + 4.0 Solutions file—
Advisor wishlist✅Advisor TargetsShipped 2026-05-21 (v0: 5 named + 5 archetypes) — this row was stale
Hires plan (Eng #1, Sales #1)✅Hires PlanCreated 2026-05-24 — current team table + 7 role categories + hiring discipline + recruitment channels + onboarding flow. Review monthly + after every pilot signed.
ENSA talent map⚠️Referenced in Feasibility Study — DigiTPME 2026Standalone 04_Strategy/ENSA Berrechid Talent Map.md (filières, PFE timeline, named profs)
Letters / outbound communications archive✅05_Team and Collaboration/Letters/Keep appending
Domain CEO Charters (aspirational team model)⚠️Domain CEO Charters — DigiTPME Operating Model (30KB, April)Reconcile with current reality (1 founder, not 12) — annotate at top

7. Operations (open daily, ritualized cadence)

How the work runs day-to-day.

DocStatusFileWhat’s missing
Home dashboard✅Home Dashboard—
Current priorities✅Current PrioritiesRefresh weekly
Weekly review template + log✅Weekly Review + 00_Home/Reviews/Keep one per week — currently sparse
Dataview dashboards✅Dataview Dashboards—
Obsidian setup guide✅Obsidian Setup Guide—
Wave delivery process⚠️Embedded in PM OS §8Standalone 04_Strategy/Wave Process.md if a team forms
Tools & subscriptions list✅Tools & SubscriptionsShipped 2026-05-21 (this row was stale) — verify costs/renewal dates are still current
Security incident response runbook❌TODO — 00_Home/Incident Response.mdWhat to do if a customer reports an outage / cyber event
SLA & support policy⏳TODO — 04_Strategy/SLA & Support Policy.mdNeeded before first signed pilot
Vendor / supplier contact list❌TODO — 00_Home/Vendor Contacts.mdDigitalOcean account / Anthropic / Cloudflare / hardware suppliers — one page
Pilot post-mortem template⏳TODO — 04_Strategy/Templates/Pilot Post-Mortem.mdAfter each pilot

The money side, the legal entity, the contracts.

DocStatusFileWhat’s missing
Feasibility study (broad)✅Feasibility Study — DigiTPME 2026—
Feasibility study (narrow Auto Tier-2)✅Feasibility Study — NOTQIN Auto Tier-2 Scorecard 2026—
Funding strategy✅Funding StrategyRefresh after sprint
Financial model spreadsheet❌TODO — 04_Strategy/Finance/NOTQIN Financial Model.xlsx5-year MAD model, bear/base/bull; current numbers only exist in prose inside feasibility
Cash runway tracker❌TODO — 04_Strategy/Finance/Runway Tracker.mdCurrent bank balance + monthly burn + months remaining; updated monthly
Invoice / revenue log—Not applicable yetBuild before first invoice
Pricing menu (canonical)✅GTM OS §6 + Aero/Auto §6—
Quote / SOW templates⚠️Via skillStatic copy in 04_Strategy/Templates/
NDA template❌TODO — 04_Strategy/Templates/NDA.mdNeeded for first customer discovery deep-dive
MSA / pilot agreement template❌TODO — 04_Strategy/Templates/MSA.mdLawyer-reviewed; needed by first contract
Legal entity status (SARL / SAS)⚠️Mentioned in feasibilityStandalone 04_Strategy/Legal/Entity Status.md — incorporation date, tax ID, RC number, bank account
Trademark / IP filings❌TODO — 04_Strategy/Legal/IP Register.mdRegister NOTQIN mark in Morocco (OMPIC)
CNDP declaration status❌TODO — 04_Strategy/Legal/CNDP Status.mdRequired before any customer industrial data is processed
Investor data room—Not applicable yetBuild before first equity meeting
Grants pipeline⏳TODO — 04_Strategy/Grants Pipeline.mdTamwilcom / MITC / IRESEN / Innov Invest application status

9. AI & Delivery Playbooks (open when planning a build)

How we use Claude / agents / skills to deliver.

DocStatusFileWhat’s missing
AI agent operating system✅AI Agent Operating System—
AI workflow overview✅AI Workflow Overview—
Claude Code power patterns✅Claude Code Power Patterns—
Parallel execution playbook✅Parallel Execution Playbook—
Memory & context strategy✅Memory and Context Strategy—
Reusable skills catalog✅NOTQIN Reusable Skills—
Remotion demo strategy✅Remotion Demo Strategy for NOTQIN—
CLI prompts library✅06_AI Workflows/CLI Prompts/—
RAG workflows✅06_AI Workflows/RAG Workflows/—
Skills source (~/.claude/skills/)✅Outside vault — 8 skills installedSymlink or skills-mirror.md in vault for visibility

10. Learning (open weekly)

Founder’s personal growth track.

DocStatusFileWhat’s missing
Learning Roadmap✅Learning Roadmap—
Digital Transformation track✅07_Learning/Digital Transformation/—
Books / courses log⏳TODO — 07_Learning/Reading & Courses Log.mdWhat you read this quarter + key takeaways
Conference / event notes⏳TODO — 07_Learning/Events Attended/One file per event with quotes, contacts, follow-ups

11. Memory (automatic, outside the vault)

Claude’s persistent memory at C:\Users\21260\.claude\projects\C--Users-21260-OneDrive-Documents-DigiTMPE\memory\. Maintained by Claude across sessions. Indexed by MEMORY.md. You don’t manually edit memory — Claude updates it on instruction. Useful for cross-session continuity (CMO roast learnings, customer-state correction, narrow-thesis decision).


Priority queue — what to build next

Order by ROI for current Phase-1 (Auto Tier-2 narrow thesis + first paying customer).

Phase 0 — shipped 2026-05-21 ✅

  1. ✅ Tools & Subscriptions inventory template
  2. ✅ NOTQIN BMC standalone (extract from PM OS §5)
  3. ✅ NOTQIN Business Model prose consolidation
  4. ✅ Regulatory Tracker v0 (18 regulations: 10 active + 8 watching)
  5. ✅ Advisor Targets v0 (5 named + 5 archetypes)
  6. ✅ Founder LinkedIn Cadence + LinkedIn Posts (4 drafted weeks)
  7. ✅ Trademark Filing Brief (OMPIC search + Class 9/42 recommendation + cost + timeline)
  8. ✅ Whitepaper proposal email to Ratnani drafted: Letters/2026-05-22 Email — Pr. Ratnani — whitepaper co-authorship proposal.md

Phase 0.5 — resolved since last audit ✅ (2026-05-24 → 2026-06-13)

  1. ✅ Brand question decided — D-002: rebrand Smartex → NOTQIN (ADR-020). Trademark Filing Brief shipped; OMPIC filing itself is still the open action (see Finance & Legal §8).
  2. ✅ Beachhead question decided — D-006: NOTQIN is industrial-first, textile/TEMASA is the sole beachhead. Auto Tier-2 + CBAM are no longer parallel tracks (supersedes D-004); they’re sequenced behind textile.

Now (this week — founder action, updated 2026-07-26)

  1. 🔴 Rewrite Path-to-Pilot + Q3-2026-strategy to match D-006 — both docs still frame Auto Tier-2/CBAM as the active parallel bet; TEMASA beachhead isn’t reflected as the primary thread yet.
  2. 🔴 File the OMPIC trademark — flagged in memory as the #1 open blocker, past its checkpoint.
  3. ⏳ Advance TEMASA Pilot 1 — paid Diagnostic (Q3) → paid Pilot (Q4) ladder per D-006.
  4. ⏳ Reconcile the two regulatory trackers (03_Research Intelligence/Regulatory Tracker.md vs 04_Strategy/Regulatory Tracker — 2026-Q2.md) into one.
  5. ⏳ Decide GMAO deploy target + G0-3 pilot scope (09_Ventures/notqin-gmao/) — built, deployed nowhere.
  6. ⏳ Fill rows 4–12 of AMICA Tier-2 Target List 2026 with real names — still open, lower priority now that auto is sequenced behind textile.

Next 30 days (post-sprint, if GO)

  1. ❌ Investor deck v1 — derive from feasibility + roadmap. Gate-conditional on first paying contract.
  2. ⚠️ Public NOTQIN site — source draft complete (NOTQIN Public Site — Content Skeleton); deploy to interim domain ahmedbenahmed.com this week, swap to notqin.ma once registered.
  3. ❌ 2-min demo video (one Saturday). Unblocks every cold-email sequence.
  4. ❌ Founder LinkedIn cadence doc + 4 ready-to-post drafts.
  5. ❌ Press kit (logo bundle + founder bio + photo + key facts) — for first journalist contact.
  6. ❌ Financial model spreadsheet — 5-year MAD bear/base/bull. Prose-in-feasibility doesn’t survive a CFO read.
  7. ❌ Regulatory tracker + CNDP declaration + Trademark filing — legal hygiene before first customer.

After first paying contract

  1. ⏳ Case study #1 (anonymous if needed) — the moment a pilot ships, capture it.
  2. ⏳ Reference call list + permission tracking.
  3. ⏳ Hires plan refresh — Eng #1 sourcing channels, comp brackets.
  4. ⏳ Master Decision Log (cross-cutting) — pull strategic forks (Hallotex reclassification, narrow-thesis pivot, etc.) into one file.

Phase 3 (aero credibility play, post-2-customers)

  1. ⏳ AOG / physics-signature whitepaper co-authored with Ahmed Ratnani (UM6P).
  2. ⏳ GIMAS aero target list.
  3. ⏳ AS9100D + IATF demo videos (90s each).
  4. ⏳ One-pager — GIMAS / Nadcap / FAI.

Anti-list — what NOT to build right now

Discipline matters more than completeness. These are tempting but wrong-cost-for-current-stage:

  • More sector GTM addenda beyond textile (cement / steel / agrifood) and the existing aero+auto one — per D-006, textile/TEMASA is the sole active beachhead; others stay parked in main GTM OS until they unlock.
  • More pitch HTMLs. Three exist; the next pitch asset should be a video or a whitepaper, not another landing page.
  • Re-writing the April Feasibility Study. Already supplemented by the narrow one.
  • Domain CEO Charters refresh. Aspirational document; reconcile only when an actual team exists.
  • Public roadmap before first customer. Risky — over-promises and audit-able by competitors.
  • Polished case studies before real customers. Synthetic case studies destroy credibility if discovered.

How to keep this index alive

  • Monthly (1st business day, during PM OS monthly ritual): scan each section, update status icons, move items between What you have and What’s missing.
  • After any major build: flip the entry from ⏳ to ✅, add the file path.
  • After any sprint or pivot: add a row in the priority queue and reorder.
  • If three months pass with no edits: the index has decayed — assume it’s lying. Re-audit by walking the vault folder by folder.

Last full audit: 2026-07-26 (previous audit 2026-05-21 — ran 5 weeks over the monthly cadence; found 5 rows falsely marked TODO/❌ despite the file already existing, one broken wikilink, and two whole additions — GMAO venture + the Decision Log itself — never folded in). Next due: 2026-08-26.